Font size- A A A
Public Utilities Department

Wastewater Treatment Plant

This division operates 2 treatment plants. Our plants are staffed 24 hours a day.

The Red River Plant, an 8 MGD activated sludge treatment system utilizes the Racetrack, oxidation ditch type treatment. This plant has a flow equalization basin to help handle excessive flows, and a N-Viro system that converts the sludge to an agricultural additive. The main drying unit is located at this site.

The Northeast Plant, a 6 MGD plant utilizes the same treatment system, and the N-Viro system except for the drying unit. The product is moved to the Red River Plant for the final treatment. Our National Pollution Discharge Elimination System laboratory is located at this facility. Both treatment plants are currently under review for enhancements to accommodate future anticipated growth.

The Louisiana Department of Environmental Quality (LADEQ) inspects both plants at a minimum of one (1) time a year.
 
 
 

 

 
Font size- A A A
Contact Us

City of Bossier City
Northeast Plant
8000 Shed Rd.
Bossier City, LA 71111
Phone: 318.741.8379
Fax: 318.741.8369

City of Bossier City
Red River Plant
3512 Barksdale Blvd.
Bossier City, LA 71112
Phone: 318.741.8374
Fax: 318.741.8376

Shawn Barton, Superintendent